CE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building Park

Product Details
Customization: Available
After-sales Service: Online Guidance
Layers: Multi-Layer
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
ODM Services
The supplier provides ODM services
to see all verified strength labels (15)
  • CE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building Park
  • CE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building Park
  • CE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building Park
  • CE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building Park
  • CE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building Park
  • CE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building Park
Find Similar Products

Basic Info.

Model NO.
customized
Usage
Electrostatic Workshop, Food And Chemical Industry, Specialized Workshop, Warehouse
Using Range
Whole World
Construction Guide
Online
Transport Package
Nope
Specification
customized
Trademark
Showhoo
Origin
China
HS Code
7308900000
Production Capacity
5000ton/Month

Product Description

CE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building Park

CE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building ParkCE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building Park

CE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building Park

CE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building ParkCE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building Park

Items

Specification
Main Steel Frame Column Q235, Q345 Welded H Section Steel
Beam Q235, Q345 Welded H Section Steel
Secondary Frame Purlin Q235 C and Z purlin
Knee brace Q235 Angle Steel
Tie Rod Q235 Circular Steel Pipe
Brace Q235 Round Bar
Support Q235 Angle Steel, Round Bar or Steel Pipe
Maintenance system Roof Panel EPS Sandwich Panel /Glass Fiber Sandwich Panel /
Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet
Wall Panel Sandwich Panel / Corrugated Steel Sheet
Accessories Window Aluminiumn Alloy Window / PVC Window / Sandwich Panel Window
Door Sliding Sandwich Panel Door / Rolling Metal Door / Personal Door
Rainspout PVC
Live load on Roof In 120kg/Sqm (Color steel panel surrounded)
Wind Resistance Grade 12 Grades
Earthquake-resistance 8 Grades
Structure Usage Up to 50 years
Temperature Suitable temperature.-50°C~+50°C
Certification CE, SGS,ISO9001:2008,ISO14001:2004
Finishing Options Vast array of colors and textures available
Paint Options Alkyd paiting, two primary painting, two finish painting
(gray paint, red paint, white paint, epoxy zinc etc.) Or Galvanized.
CE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building Park
CE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building Park

1. Location (where to build? ) _____country, area
2. Size: Length*width*height _____mm*_____mm*_____mm
3. wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
4. snow load (max. Snow height)_____kn/m2, _____mm
5. anti-earthquake _____level
6. brickwall needed or not If yes, 1.2m high or 1.5m high
7. thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested;
8. door quantity & size _____units, _____(width)mm*_____(height)mm
9. window quanity & size _____units, _____(width)mm*_____(height)mm
10. crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m


CE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building Park
CE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building ParkCE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building Park
 
CE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building Park
CE Certificated Assembled Insulated China Top Factory Prefab Steel Structure Frame Logistic Metal Building Park

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier